Woods-powr-grip MRTARC811LDC User Manual Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 38
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
Rev 2.0/7-12 5 MRTA8-DC: #35076RC
ASSEMBLY
TO SET UP THE LIFTER
1) Open the shipping container and remove all materials for restraining or protecting the vacuum
lifter. Save the container for use whenever the lifter is transported.
2) Suspend the lifter from a crane as follows: Select hoisting equipment (crane and hoist, when
applicable) rated to carry the maximum load weight plus the lifter weight (see
SPECIFICATIONS: Maximum Load Capacity and Lifter Weight).
Note: Any application of the lifter must conform to all statutory or regulatory standards that
relate to the hoisting equipment when used in its geographical location (eg, relevant OSHA
standards in the USA).
WARNING: Hoisting equipment hook must be fitted with restraining latch to
prevent lift spool from slipping off under any circumstances.
If the lifter is equipped with the optional tilt lock, make sure it is either disengaged or locked
out (see OPERATION: TO LIFT AND MOVE THE LOAD: Using or Locking out the Optional Tilt Lock).
Then raise the lift bar to a vertical orientation and attach the hoisting equipment hook to the
lift spool.
Note: Some hoisting equipment hooks could interfere with an upright load that extends
beyond the lifter's pad frame. If the load would contact the hook during lifter operation, the
operator must prevent this by attaching a sling (or other rigging that does not interfere with
the load) between the hook and the lift spool.
WARNING: Any sling used must be rated to carry maximum load weight plus
lifter weight.
Use the hoisting equipment to raise the lifter out of the shipping container, being careful to
avoid damaging any vacuum pads. The control pendant for the hoisting equipment can be
attached to the lifter by inserting it into the hoist pendant basket provided. Remove the pad
covers and save them for use whenever the lifter is stored.
3) Arrange the pad frame in the configuration that will provide optimal support of the load while
lifting (see TO CHANGE THE PAD FRAME CONFIGURATION to follow).
4) Connect the electrical connectors uniting the battery to the battery charger and the vacuum
generating system. Now the lifter is operational.
5) Perform Operational and Load Tests for the lifter as directed in MAINTENANCE: TESTING
SCHEDULE. If the lifter is equipped with a Remote Control System, also perform the REMOTE
CONTROL SYSTEM TEST (see MAINTENANCE).
Page view 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 37 38

Comments to this Manuals

No comments